Easement Templates

Print
Press Enter to show all options, press Tab go to next option

The documents listed below are the City's current standard easement forms for use on public improvements in the City of Redmond. Use these forms "as is." Do not alter the standard language contained in these forms in any manner. Upon review of your submitted form by the City, if altered language is found, the form will be rejected. If you believe alternative language is absolutely necessary, the language must have prior approval of the City Engineer and City Attorney before the document is signed by Grantor and submitted to the City. These documents are City of Redmond documents and you should consult an attorney if you have any questions on their applicability or use on your project.  If you need additional information regarding easement, please contact David Pilling, Engineering Development Manager, at (541) 504-2013.

City of Redmond Easement Requirements

Pedestrian Path Easement

Pedestrian Path Easement vs COID Canal

Public Access Utility Easement

Public Access Utility Easement vs Private Drive

Public Art Easement

Public Utility Easement

Right of Way Deed of Dedication

Sewer Easement vs Private Street

Sewer Easement

Sewer Pump Station Easement

Sewer Sampling Manhole Easement

Sewer Water Easement vs Private Street

Sewer Water Easement

Sewer Water Pedestrian Easement

Sidewalk Easement

Sidewalk Utility Easement

Slope Easement

Storm Drainage Easement

Storm Retention Basin Easement

Water Easement vs Private Street

Water Easement

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer