Infrastructure Allocation Analysis Application

Print
Press Enter to show all options, press Tab go to next option
Master plans for the City of Redmond designate how new developments will be served by water, wastewater and transportation infrastructure, but in some areas that infrastructure is not readily available.  For example, property to the west of SW 35th Street is designated to be served by the Far West Sewer Interceptor, but that line is not yet in place.  Modeling of the wastewater system indicates that there is some excess capacity in Sewer Line D which runs in SW 35th Street.  The City will consider applications to use that excess capacity under certain conditions.  The requirements for allocation of excess capacity are outlined in the Excess Capacity Infrastructure Allocation Policy.  Please click here to access the  Infrastructure Allocation Analysis application.  

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer