Airport Master Plan
Final Technical Report
April 2005

Warning: The followingPDF Adobe Acrobate documents are large files (some are very large) and may take several minutes to open. Where possible, we have removed all charts & pictures for text only versions of the documents to make them smaller, but these are still fairly large files. You can find the pages that were removed under the "Exhibits" section of this page.

Chapter One (text only version)
INVENTORY
REGIONAL SETTING 1-1
     Infrastructure 1-2
     Climate 1-2
     Utilities 1-3
AIRPORT SYSTEM PLANNING ROLE 1-3
AIRPORT ADMINISTRATION 1-4
COMMERCIAL AIR SERVICE 1-4
AIR CARGO SERVICE 1-4
AIRPORT FACILITIES 1-4
     Airside Facilities 1-5
     Landside Facilities 1-9
ENROUTE NAVIGATION AND AIRSPACE 1-11
     Instrument Approach Procedures 1-12
     Vicinity Airspace 1-14
     Air Traffic Control 1-15
     Area Airports 1-15
SOCIOECONOMIC CHARACTERISTICS 1-16
     Population 1-16
     Employment 1-17
     Income 1-20
SUMMARY 1-20
   
Chapter Two (text only version)
FORECASTS
 
NATIONAL AVIATION TRENDS 2-1
     Regional/Commuter Airlines 2-2
     General Aviation 2-4
FORECASTING APPROACH 2-5
AIRPORT SERVICE AREA 2-6
AVIATION ACTIVITY FORECASTS 2-7
     Commercial Service 2-7
     Air Cargo 2-13
     United States Forest Service - Redmond Air Center 2-13
     Air Taxi and Military Operations 2-14
     General Aviation 2-14
     Peaking Characteristics 2-21
     Annual Instrument Approaches 2-22
SUMMARY 2-23
   
Chapter Three (text only version)
FACILITY REQUIREMENTS
 
AIRFIELD REQUIREMENTS
3-2
     Airfield Design Standards 3-4
AIRFIELD CAPACITY 3-5
     Factors Affecting Annual Service Volume 3-5
     Calculation of Annual Service Volume 3-9
AIRSIDE FACILITIES 3-10
     Runway Orientation 3-10
     Taxiways 3-13
     Airfield Marking, Lighting, and Signage 3-14
     Navigational and Approach Aids 3-14
LANDSIDE REQUIREMENTS 3-16
     Terminal Area Requirements 3-16
GENERAL AVIATION REQUIREMENTS 3-18
     Hangars 3-18
     Aircraft Parking Apron 3-20
SUPPORT REQUIREMENTS 3-21
     Aircraft Rescue and Firefighting 3-21
     Airport Maintenance/Storage Facilities 3-21
     Fuel Storage 3-22
SUMMARY 3-22
   
Chapter Four (text only version)
AIRPORT DEVELOPMENT ALTERNATIVES
 
BACKGROUND 4-2
INITIAL DEVELOPMENT CONSIDERATIONS 4-3
NO ACTION ALTERNATIVE 4-3
AIRFIELD ALTERNATIVES 4-3
     Runway Considerations 4-4
     Taxiway Considerations 4-5
     Proposed Parallel Runway 4-6
TERMINAL ALTERNATIVES 4-7
AIR CARGO FACILITIES 4-7
GENERAL AVIATION FACILITIES 4-8
NAVIGATIONAL AND APPROACH AIDS 4-8
DEVELOPMENT OF NON-AVIATION PROPERTIES 4-10
     Airport-Related Commercial Service Businesses 4-11
     Aviation-Oriented Businesses 4-11
     Aviation/Aerospace Manufacturers 4-11
     Non-Aviation Industrial/Commercial Uses 4-11
     Roberts Field Business Center 4-12
SUMMARY 4-13
   
Chapter Five (text only version)
AIRPORT PLANS & LAND USE COMPATABILITY
 
RECOMMENDED MASTER PLAN CONCEPT 5-1
     Airfield Design Standards 5-2
     Airfield Recommendations 5-3
     Air Cargo Recommendations 5-3
     General Aviation Recommendations 5-3
     Land Use Recommendations 5-4
LAND USE COMPATABILITY 5-4
AIRPORT LAYOUT PLAN DRAWINGS 5-4
     Airport Layout Plan 5-7
     Airport Airspace Drawings 5-7
     Inner Approach Surface and Runway Profile Drawings 5-8
     Terminal Area Drawings 5-8
     Land Use Drawing 5-9
     Exhibit A (Property Map) Drawing 5-9
SUMMARY 5-9
   
Chapter Six
CAPITAL IMPROVEMENT PROGRAM
 
AIRPORT DEVELOPMENT SCHEDULE AND COST SUMMARIES 6-2
CAPITAL IMPROVEMENT FUNDING 6-3
     Federal Grants 6-6
     Passenger Facility Charges 6-8
     Local Share Funding 6-9
IMPLEMENTATION 6-10
   
EXHIBITS  
1A   VICINITY MAP after p. 1-2
1B   EXISTING AIRFIELD FACILITIES after p. 1-6
1C   EXISTING LANSIDE FACILITIES after p. 1-10
1D   AREA AIRSPACE after p. 1-12
   
2A   U.S. REGIONAL/COMMUTER FORECASTS after p. 2-4
2B   U.S. ACTIVE GENERAL AVIATION AIRCRAFT FORECASTS after p. 2-4
2C   ENPLANEMENT FORECAST SUMMARY after p. 2-12
2D   BASED AIRCRAFT FORECAST SUMMARY after p. 2-18
2E   FORECAST SUMMARY after p. 2-23
   
3A   AIRPORT REFERENCE CODES after p. 3-4
3B   AIRFIELD CAPACITY FACTORS after p. 3-6
3C   PASSENGER TERMINAL BUILDING REQUIREMENTS after p. 3-18
   
4A   DEVELOPMENT ALTERNATIVE CONSIDERATIONS after p. 4-4
4B   AIRFIELD ALTERNATIVE A after p. 4-4
4C   HIGHWAY 126 REALIGNMENT ALTERNATIVE after p. 4-6
4D   VETERANS WAY/AIRPORT WAY REALIGNMENT after p. 4-6
4E   AIRFIELD ALTERNATIVE B - PARALLEL RUNWAY after p. 4-6
4F   LANDSIDE ALTERNATIVE after p. 4-8
4G   ROBERTS FIELD BUSINESS CENTER after p. 4-12
   
5A   MASTER PLAN CONCEPT after p. 5-2
5B   EXISTING NOISE CONTOURS after p. 5-4
5C   INTERMEDIATE NOISE CONTOURS after p. 5-4
5D   ULTIMATE NOISE CONTOURS after p. 5-4
Q400 Aircraft Single Event Level (SEL) Contours  added 4/21/09 
Q400 Aircraft Single Event Level (SEL) Contours  added 4/21/09 
MD80 Aircraft Single Event Level (SEL) Contours  added 4/21/09 
MD80 Aircraft Single Event Level (SEL) Contours  added 4/21/09 
COVER SHEET  
AIRPORT LAYOUT PLAN after p. 5-9
AIRPORT LAYOUT DATA SUMMARY after p. 5-9
AIRPORT AIRSPACE DRAWING RUNWAY END 4L & 4R after p. 5-9
AIRPORT AIRSPACE DRAWING RUNWAY END 22R & 22L after p. 5-9
AIRPORT AIRSPACE PROFILES RUNWAY 10/28 & 4L/22R after p. 5-9
AIRPORT AIRSPACE PROFILES RUNWAY 4R/22L after p. 5-9
INNER PORTION OF THE APPROACH SURFACE RUNWAY 4L/22R after p. 5-9
INNER PORTION OF THE APPROACH SURFACE RUNWAY 10/28 after p. 5-9
INNER PORTION OF THE APPROACH SURFACE RUNWAY 4R/22L after p. 5-9
TERMINAL AREA PLAN (11) after p. 5-9
TERMINAL AREA PLAN (12) after p. 5-9
LAND USE after p. 5-9
AIRPORT PROPERTY MAP, EXHIBIT "A" after p. 5-9
   
Appendix A
GLOSSARY OF TERMS AND ABBREVIATIONS
 
Appendix B
BUILDING EVALUATION
 
Appendix C
AIRFIELD DESIGN STANDARDS
 
Appendix D
AIRCRAFT NOISE ANALYSIS
 
Appendix E
TERMINAL EXPANSION DIAGRAMS
 
Appendix F
ENVIRONMENTAL EVALUATION
 
Appendix G
LEASE SUMMARIES
 
ResidentsVisitorsBusinessGovernment